The outfield

The outfield had suffered from drainage problems for some time and this was a project due to be completed. This consisted of a sand slit plus a sand carpet.

There were 13 km of sand slits and a sand carpet cover of 40 mms over the top.

Whizz Wheel to cut slits

Step one
: Slits established in outfield. This was achieved with a ‘whiz wheel’
Close up of slit

Step two:
A close up of a slit, with pea metal and sand over the top
Slits 1 metre apart

Step three:
The slits were spaced 1 metre apart
Sand carpet applied

Step four:
The sand carpet being applied. ‘Brushing’ the sand.
Grass sewn through each layer

Step five:
The sand carpet was laid in 5 lots of 8mm at a time. Grass was sewn through each layer
Blackcaps tryout new outfield

Black Caps Training Camp:
The Black Caps were among the first to test out both the pitch and the outfield